Questica Questica
   
 

CONTACT DETAILS

TEL: (905) 634-0110
FAX: (905) 634-4039
TOLL FREE: (877) 707-7755

info@questica.com

Is Questica SE Right For You?

Welcome to the ETO Qualifier

The following screens will evaluate if your company is an “Engineer to Order” Manufacturer and if Questica SE is the right system for you.

1. Engineering releases the Bill of Material (BOM) in stages to Manufacturing throughout the design process. Engineering goes through a great deal of effort to manage and maintain BOM with purchasing and manufacturing.

Happens:





2. Clients often request changes to the order during the design process (and occasionally after the design has been issued to purchasing and manufacturing) affecting design time and purchasing efforts.

Happens:





3. The plant often identifies areas where the design needs to be changed, requiring Engineering to modify the drawings and the BOM while Purchasing is left to change the purchase orders.

Happens:





Next Page

© 2008 Questica Inc. All rights reserved. Privacy Statement